Greater Cairo Metro System Graduation Project

Greater Cairo Metro System Graduation Project
اسم المؤلف
Mahmoud Ibrahim Behery , Mahmoud Al-Mahdy Mahmoud , Mohamed Mostafa Hussein , Mohamed Nagy Fouad , Mohamed Rafat Ahmed , Mahmoud El-Sayd Nazmy
التاريخ
20 ديسمبر 2019
المشاهدات
307
التقييم
(لا توجد تقييمات)
Loading...

مشروع تخرج بعنوان
Greater Cairo Metro System
Graduation Project
Construction Engineering and Utilities Department
Construction Engineering and Management
Line (3) – Phase (2)
Prepared By:
Mahmoud Ibrahim Behery – Mahmoud Al-Mahdy Mahmoud
Mohamed Mostafa Hussein – Mohamed Nagy Fouad
Mohamed Rafat Ahmed – Mahmoud El-Sayd Nazmy
Supervised By:
Dr. Adel El- Kelesh
Eng. Ahmed El – Sayed
Contents Pages
2 0 1 3
Chapter 1: Introduction .1-8
Chapter 2: Tunnels 9-76
– Definition
– Tunnel construction methods
– Cut and cover method
– Pipe jacking method
– Classical method
– NATM method
– Advantage and disadvantage for each method
– Comparison
– Tunnel construction in Egypt
Chapter 3: Construction of line (3) – phase (2)
77-112
– Introduction
– In General :-
– General description
– TUNNEL EXCAVATION
• General
• Confinement of the excavation chamber
• Principle
• EPB system description
• Tunnel progress in normal conditions
• Excavation
• Mortar injection behind the segment
• Excavation with the cutter-Head
• Description of Cutter Head Structure
• Description of permanent Cutting system
• Excavation , roll correction and over cutting
• Mortar injection
• Description of the injection system
• Operation of the mortar injection system
• Supply of mortar to the TBM
• TBM shield advance and steering
• General
• Description of the main thrust unit
• Advance and steering control
• Tail skin grease injection system
• Tunnel mucking
• Screw conveyorContents Pages
2 0 1 3
• Screw safety gate
• Screw – conveyor discharge gate
• Screw conveyor operation
• Belt conveyor
– Tunnel lining ( ring ) erection
• Tunnel lining
• Characteristics of the precast segments
• Key selection
Chapter 4: Construction Method of Haroun Metro
Station. . 113-180
– Introduction of Haroun Station
– Construction Method of the station
– Guide wall
• Definition
• Resources used in construction of guide wall
• Construction Method of guide wall
– Diaphragm Wall
• Definition
• Resources used in construction of diaphragm wall
• Construction Method of diaphragm wall
– Barrettes
• Definition
• Resources used in construction of barrettes
• Construction Method of Barrettes
– Slabs
• Definition
• Resources used in construction of slabs
• Construction Method of Slabs
– Columns
• Definition
• Resources used in construction of columns
• Construction Method of Columns
– Design Consideration for deep excavation
– Planning of subsurface investigation and laboratory testing
• Field Tests
• Laboratory test
– Evaluation of Foundation of adjacent properties and their
tolerances
– Building Damage due to Ground movement
– Selection of type of retaining wall
• Sheet pile wall
• Soldier pile wall
• Contiguous bored pile wallContents Pages
2 0 1 3
• Secant pile wall
• Diaphragm wall
– Selection of support system
– Comparison between all types of retaining wall
– Method statement of diaphragm wall
– Why is the use of diaphragm wall in station?
– Drilling diaphragm wall
– Diaphragm wall construction using grab excavation
– Diaphragm wall Construction using trench cutter
– Comparison between hydraulic grab and hydro-fraise
– Method statement of station
– Top down
– Bottom up
– Comparison between top down and bottom up
Chapter 5: Special Issues 181-193
Chapter 6: Management of Haroun station
.194-289
– Cost Estimate & Tendering
– Planning & Scheduling
– Resources Management
– Financial Management
Chapter 7: Risk Management 290-291
Chapter 8: Safety .292-317
References . 318
Appendices 319-332
كلمة سر فك الضغط : books-world.net
The Unzip Password : books-world.net

تحميل

يجب عليك التسجيل في الموقع لكي تتمكن من التحميل
تسجيل | تسجيل الدخول

التعليقات